Framework B — Prescription

The applicable and effective task

With the diagnosis in hand, Framework B decides what to do — in the RCM order of preference (SAE JA1011; Moubray, RCM II). A task only enters the plan if it is technically APPLICABLE (detects or prevents that failure mode) and WORTH DOING (costs less than the consequence it avoids).

The task hierarchy

  1. 1
    CBM

    On-condition — if the failure gives a measurable warning (P-F interval), monitor the condition and act on the signal. Inspection ≤ P-F/2.

  2. 2
    TBM

    Scheduled restoration/discard — only when a defined wear-out zone exists (β > 1 with predictable age). Interval before the wear zone.

  3. 3
    Proof Test

    Failure-finding — for HIDDEN functions (protections, redundancies): tests the function at the interval (FFI) dictated by the required availability.

  4. 4
    RTF

    Run to failure — legitimate when nothing above applies and the consequence is economic only.

  5. 5
    Redesign

    Redesign — compulsory when the consequence is safety/environmental and no task reduces the risk to a tolerable level.

Consequence as the filter

The same technical failure changes strategy with its consequence: safety/environmental demands proven risk reduction (or redesign); operational weighs downtime cost; non-operational weighs repair cost only. That is why the selector asks about consequence before closing the decision.

In the collection

Every failure-mode note publishes with its Framework B decision and an exportable maintenance plan (green panel) — coherence enforced at build time: CBM requires a P-F interval, proof testing requires a hidden failure, RTF requires no P-F.